Erha North

Erha North Phase 2 Project

Posted on Posted in Work

The Erha North Phase 2 project is a deepwater subsea development located 60 miles offshore Nigeria in 3,300 feet of water and four miles north of the Erha field, which has been producing since 2006. The Erha North Phase 2 project includes seven wells from three drill centers tied back to the existing Erha North floating production, storage and offloading vessel, reducing additional infrastructure requirements.

The project is estimated to develop an additional 165 million barrels from the currently producing Erha North field. Peak production from the expansion is currently estimated at 65,000 barrels of oil per day and will increase total Erha North field production to approximately 90,000 barrels per day.

Petrolage is proud to support this project.